Customer overview
Malaysia stacker stereoscopic warehouse project
The most advanced stacker technology and automated control system are used to achieve rapid storage and retrieval of goods.
The project height is more than 30 meters
Handling process: automatic palletizing line/manual palletizing → silo elevator.
Selected products: 4 pallet four-way vehicles and 3 pallet elevators
System configuration: WMS warehouse management system, intelligent and automated hardware-software full process
Corridor transportation: The logistics flow line between the warehouse and the production workshop is optimal, effectively improving the efficiency of material handling
Solved the problems of low automation of material storage and insufficient space utilization.
Cost investment: three shifts, repeated ineffective operations, and rising costs year after year.
Shape monitoring: manual palletizing is highly random, and it is time-consuming and laborious to return unqualified shapes.
Flexible logistics: the site space is compact and does not support secondary transformation of the site environment.
Operation efficiency: there is no warehouse information management on site, and the efficiency of picking and finding goods is slow.
Increase storage capacity by 4.5 times
Increase efficiency by 10%
Increase timeliness by 8%
Reduce 6 workers
Precise docking
All-round safety guarantee