9192 pallet positions, solving high cost problems

Customer overview

  • This project solves the problems of high land cost and high warehouse construction cost for customers; in terms of system efficiency, safety, fault tolerance, reducing dependence on staff, improving capacity, and ensuring sustainable high-efficiency operations in the warehouse.


9192 pallet positions, solving high cost problems
Project Background
  • The planned and designed cargo positions are 9192 pallet positions

  • Handling process: automatic palletizing line/manual palletizing → silo elevator.

Solution
  • Selected products: 6 stackers, etc.

  • System configuration: WMS warehouse management system, intelligent and automated hardware-software process

  • Solved the problems of low automation of material storage and insufficient space utilization.

Project Difficulties
  • Cooperative docking: requires coordinated docking of conveyor lines and elevators, and low labor efficiency.

  • Cost investment: three shifts, repeated ineffective operations, and rising costs year after year.

  • Flexible logistics: compact site space, does not support secondary transformation of the site environment.

  • Operation efficiency: there is no warehouse information management on site, and the efficiency of picking up and finding goods is slow.

Project value
  • Increase storage capacity by 4.5 times

  • Increase efficiency by 10%

  • Increase timeliness by 8%

  • Reduce 6 workers

  • All-round safety guarantee